Compensation: $52.28/ Hourly. Temporary position; 8 hours workdays; 5 days a week
THE AGENCY
Zone 7 provides treated drinking water to four major water retailers serving around 260,000 residents and businesses. We take pride in recruiting and retaining a highly qualified and committed staff who are all just as dedicated to community service as they are to each other. We employ approximately 115 full-time employees in a diverse range of fields, responsible for the massive job of keeping clean, safe water delivered to the Tri-Valley.
THE POSITON
Under general supervision, performs heavy physical labor work required for the construction, maintenance, or repair of facilities and equipment found in a water distribution system, water treatment facilities or flood control facilities; and performs related work as required.
Incumbents in this class can be located in either the Maintenance or Flood Maintenance section in the Agency and are primarily responsible for performing heavy manual labor related to maintenance, construction, or flood control activities.
For a detailed listing of the essential responsibilities and core competency requirements for this position, please click here for the job description.
TO APPLY: send resumetohr@zone7water.comwith a subject line of Temporary Laborer Position. Apply no later than September 4, 2024.
MINIMUM QUALIFICATIONS
Experience:
The equivalent of two (2) years of experience in construction, pipeline and/or vegetation maintenance work, which has provided the required knowledge and skills.
License:
Possession of a valid California driver’s license.
Other Requirements:
Must be willing to work in areas with potential exposure to hazardous materials, in confined spaces with respiratory protection equipment, with frequent exposure to traffic and machine noise, and outdoors in all weather conditions.
Occasionally works in excavations with unsanitary conditions.
Requires sufficient physical strength and agility to perform heavy manual labor, equipment operation, inspection and maintenance tasks, and to unload, store and transfer supplies and equipment.
Zone 7 Water Agency supplies treated drinking water to retailers serving approximately 260,000 residents and businesses in Pleasanton, Livermore, Dublin and, through special agreement with the Dublin San Ramon Services District, the Dougherty Valley area of San Ramon. Zone 7 also supplies untreated irrigation water (mostly to vineyards) and provides flood protection to eastern Alameda County.
For more information regarding the Alameda County Flood Control and Water Conservation District, Zone 7, please visit their website at http://www.zone7water.com.